Horizon Power: Power to You
Skip Navigation
  • About Us
  • Careers
  • Contact Us
  • Site Map
  • Search
Weather Icon
Karratha, WA  »
Unavailable
  • Residential
    • Pay Your Account
      • Online Payment
      • By Mail
      • BPAY
      • Pay in Person
      • Pay Over The Phone
      • Payment Difficulties?
      • Centrepay
      • Budget Card
    • Open Or Close An Account
      • Open And Close An Account
      • Close An Existing Account
      • Open An Account
    • Request Account
    • Account Balance
    • Change Mailing Address
    • Claims
      • Compensation For Damage
      • Extended Outage Payment Scheme
      • Planned Power Interruption
    • Your Account
      • Get Connected
      • Understanding Your Account
      • Your Meter Box
      • Code of Practice
      • Products & Services
      • Prices, Fees & Rebates
    • Building a New Home
    • Network Connection Application Forms
      • Contributory Extension Scheme Enquiry Form
    • Installing a renewable energy system - online pre-qualification
  • Business
    • Your Account
      • Pay Your Account
      • Your Meter Box
      • Get Connected
      • Prices & Fees
      • Claims
    • Building a New Business Property
    • Contestability
      • Choosing your Electricity Supplier
      • Deregulation FAQs
    • Network Connection Application Forms
      • Contributory Extension Scheme Enquiry Form
    • Manuals & Standards
  • Major Projects
  • Environment
    • Betterways
    • GreenSelect green energy product
    • Renewable Energy Buy-back Scheme (REBS)
    • Feed-in Tariff
    • Energy Saving Ways
      • Consumption Calculator
      • Before You Build
      • In Your Home
    • Environmental Management
      • Environmental Policy
      • Environmental Management System
      • Environmental effects
    • Trees and Powerlines
      • Tree and Vegetation Management
      • Planting Guide
      • Why should my trees be trimmed?
      • Australian Natives
      • Western Australian Natives
      • Exotic Plants
    • Renewable Energy
      • History of Renewable Energy in WA
      • Wind Power
      • Bioenergy
      • Solar Power
      • GreenSelect green energy product
    • Greenhouse Effect
      • Greenhouse Effect Overview
      • The Kyoto Protocol
      • Australian Climate Change Measures
      • State Renewable Energy Policy
      • Cooperative Agreement
    • National Pollutant Inventory
  • Commercial Partners
    • Goods and Service Suppliers
      • Safety and Health Policy Overview
      • Environment Policy overview
    • Policies and guidelines
    • Metering Service
      • Metering Requirements
      • Approved Metering Installation Providers
      • Mandatory Link Criteria & Metrology Procedure
      • 415 Volt CT Switchboard
      • Automated Meter Reading (AMR)
      • Application Forms
Home » Horizon News

New Power Station now feeding into the grid

Release Date: 18 February 2010

After a rigorous commissioning and testing period, the gas turbine installed in the new Karratha Power Station reached and maintained the reliability and performance targets required to commence commercial operations on Sunday 14 February.

Horizon Power will have direct control of the new Karratha Power Station, which is a shift from historical power supply arrangements in the Pilbara that have previously been under contracts with mining companies.

Horizon Power’s Managing Director, Rod Hayes commented that “the construction of this power station allows us to have a direct relationship with our customers, ensuring we have greater control over our ability to deliver a reliable and high quality power supply”.

The constructor, owner and operator of the new power station, ATCO Power, was pleased to deliver this major milestone on time.  Geoff Walshe, Managing Director ATCO Power Australia said, “the relationship between ATCO and Horizon Power is proving very effective as we reached this milestone without any incident”.

When completed, the gas fired power station will provide 86 MW into the North West Interconnected System, generating it with modern, energy efficient technology and significantly lowering the carbon emissions produced.

The second gas turbine remains to be commissioned and commercial operation of this turbine will complete the project.

Ends



Contact Reference: Evette Smeathers  Phone: 0428 979 283

Last Updated: 18 February 2010

© 2010, Horizon Power (ABN 57 955 011 697). All Rights Reserved

Your use of this web site constitutes acceptance of the Horizon Power Terms of Use, Privacy Policy & FOI Guide