Horizon Power has received approval from the Economic Regulation Authority for the mandatory link criteria under Part 6 of the Electricity Metering Code.
The mandatory link criteria deals with the communication links required by metering installations so as to enable meters to be read from remote locations via telecommunication networks.
The following documents explain the mandatory link criteria, and the approval received from the Economic Regulation Authority.
The Economic Regulation Authority has also approved Horizon Power's Metrology Procedure for Meter Installations. A copy of the procedure is provided below.
PDF files on this page will require a copy of the Adobe Acrobat Reader. If you do not have it already, download it for free.
Last Updated: 15 September 2006
© 2007, Horizon Power (ABN 57 955 011 697). All Rights Reserved
Your use of this web site constitutes acceptance of the Horizon Power Terms of Use, Privacy Policy & FOI Guide