This form must be submitted to Horizon Power to establish a new customer electricity account. To obtain a new supply connection, an Electrical Contractor's Preliminary Notice is also required with this form.
This form is required to arrange for Current Transformer (CT) metering when there will be no increase in demand, eg replacement of existing switchboard or metering.
This form is to be submitted to Horizon Power prior to an AMR system being installed. It outlines the project details and enables Horizon Power to liaise with the AMR installer in relation to metering and communication issues.
This form is to be completed and submitted to Horizon Power's inspectorate where the electrical contractor disagrees with the application of an Inspector's Order (I-type) and requires a review of the re-inspection fee.
This form is to be completed and submitted to Horizon Power's Connectin Office before a property is demolished. Customers must contact 1800 267 926 (residential) or
1800 737 036 (business) to finalise their account before the supply can be disconnected.
PDF files on this page will require a copy of the Adobe Acrobat Reader. If you do not have it already, download it for free.
Last Updated: 19 May 2006
© 2007, Horizon Power (ABN 57 955 011 697). All Rights Reserved
Your use of this web site constitutes acceptance of the Horizon Power Terms of Use, Privacy Policy & FOI Guide