Horizon Power: Power to You
Skip Navigation
  • About Us
  • Careers
  • Contact Us
  • Site Map
  • Search
Weather Icon
Karratha, WA  »
Unavailable
  • Residential
    • Pay Your Account
      • Online Payment
      • By Mail
      • BPAY
      • BPAY View
      • Pay in Person
      • Pay Over The Phone
      • Payment Difficulties?
      • Centrepay
      • Budget Card
    • Open Or Close An Account
      • Open And Close An Account
      • Close An Existing Account
      • Open An Account
    • Request Account
    • Account Balance
    • Change Mailing Address
    • Claims
      • Compensation For Damage
      • Extended Outage Payment Scheme
      • Planned Power Interruption
    • Your Account
      • Get Connected
      • Understanding Your Account
      • Your Meter Box
      • Code of Practice
      • Products & Services
      • Prices, Fees & Rebates
    • Building a New Home
    • Network Connection Application Forms
      • Contributory Extension Scheme Enquiry Form
  • Business
    • Your Account
      • Pay Your Account
      • Your Meter Box
      • Get Connected
      • Prices & Fees
      • Claims
    • Building a New Business Property
    • Contestability
      • Choosing your Electricity Supplier
      • Deregulation FAQs
    • Network Connection Application Forms
      • Contributory Extension Scheme Enquiry Form
  • Major Projects
  • Environment
    • Energy Saving Ways
      • Consumption Calculator
      • Before You Build
      • In Your Home
      • Renewable Energy Rebate Programs
    • Environmental Management
      • Environmental Policy
      • Environmental Management Systems
      • Environmental Effects
    • Trees and Powerlines
      • Tree and Vegetation Management
      • Planting Guide
      • Why should my trees be trimmed?
      • Australian Natives
      • Western Australian Natives
      • Exotic Plants
    • Renewable Energy
      • History of Renewable Energy in WA
      • Wind Power
      • Bioenergy
      • Solar Power
      • GreenSelect green energy product
    • Greenhouse Effect
      • Greenhouse Effect Overview
      • The Kyoto Protocol
      • Australian Climate Change Measures
      • State Renewable Energy Policy
      • Cooperative Agreement
    • National Pollutant Inventory
  • Commercial Partners
    • Service Supplier Accreditation
      • Supplier of Goods Only
      • Introduction and Instructions
      • Documentation Checklist
      • Safety and Health Overview
      • Environment Overview Statement
    • Policies & Guidelines
    • Metering Service
      • Metering Requirements
      • Approved Metering Installation Providers
      • Mandatory Link Criteria & Metrology Procedure
      • 415 Volt CT Switchboard
      • Automated Meter Reading (AMR)
      • Application Forms
Home » Business » Your Account » Prices & Fees » Network Charges

Network Charges

In This Section
  • Fees Overview
  • Network Charges
  • K2 Tariff
  • L2 Business Tariff
  • C2 Tariff
  • D2 Tariff
  • M2 Tariff
  • Caravan Park Price Equity Scheme
CURRENT 1st July 2003
All Charges include GST
Purpose Service Charges
Supply Disconnect / Reconnect Disconnection / Reconnection of overhead service leads or underground consumer's main at the customer request * $250.00
High Load Survey Minimum charge to carry out high load route estimate $345.00
Customer Connection To provide an overhead service or upgrade to customer point of supply or connect new underground consumer's main * $300.00
Pole to Pillar Subsidised cost up to 3 Dwellings per lot (More than 3 dwellings per lot is considered a subdivision development at full cost) One Dwelling $750.00
Two Dwellings $1500.00
three Dwellings $2250.00
Project Cancellation Charge if project is changed by customer
Admin Charge - Cancellation or scope change prior to commencement of construction plus design cost incurred $345.00 Plus design costs
Admin Charge - Cancellation of job or scope change after construction commenced plus costs incurred on project prior to cancellation or scope change. $345.00
Plus costs Incurred
Western Australian Planning Commission WAPC copy of clearance to be resent by WAPC $58.00
WAPC Amendment to original drawing submitted $58.00
WAPC Incorrect/insufficient detail provided to enable clearance $115.00
Administration Charges Admin Charge - Reprint of GST invoice/account and or name change $12.00
Admin Charge - Reprint of GST invoice with name change and alteration to body of invoice $105.00
Underground Distribution Schemes
Option A & B
Feasibility Studies Information (DFIS MAP) $250.00
Design Information Package $495.00
Design Conformance Review
per stage

Variable Charge per lot
$330.00

$5.50
Design Re- Conformance Review per stage
Variable Charge per lot
$220.00

$2.75
Quality Assurance A & B schemes per stage
Variable charge
- Commercial/Industrial per meter of trench
$1055.00

$0.79/m

Please Note: * these charges are for the services up to 63 amperes only

All Network Charges will be charged to the person making the application for service

Last Updated: 8 February 2006

© 2007, Horizon Power (ABN 57 955 011 697). All Rights Reserved

Your use of this web site constitutes acceptance of the Horizon Power Terms of Use, Privacy Policy & FOI Guide